Edit Content

Est adipisci rutrum minim hat dolorum, nobis nonummy natoque dolores delectus magna turpis.

Solar for Tricity Homes: Clean Power, Big Savings

Across Chandigarh, Mohali, Panchkula and Zirakpur, thousands of homeowners are now shifting to solar because sunlight is not just warmth — it's a powerful source of free electricity. Using photovoltaic (PV) technology, sunlight is converted into usable energy for your home or business.

With rising electricity bills in Tricity and government subsidies available for residential customers, installing a rooftop solar system has become one of the smartest and most profitable investments for families in the region.

Whether you live in a kothi in Sector 21 Chandigarh, a flat in Mohali, or an independent house in Panchkula, a rooftop solar plant can drastically cut your monthly bill and make you energy-independent.

Where Can Solar Be Installed in Tricity?

Rooftop Solar PV systems can be installed almost anywhere in the region:

If your sanctioned load is more than 1.25 kW, solar becomes even more profitable. Most Tricity homeowners recover their investment in 6–8 years, and the system continues producing free electricity for 25+ years.

Solar Subsidy for Tricity Residents

(Chandigarh, Mohali, Panchkula)

Residents of Tricity can lower their upfront cost through MNRE’s Rooftop Solar Programme Phase-II, which offers a fixed subsidy based on system size.

Subsidy Rates (MNRE – Applicable for Chandigarh, Mohali & Panchkula)

Solar Plant Capacity Subsidy Amount
1 kW ₹30,000
2 kW ₹60,000
3 kW & above ₹78,000 (fixed)
RWA/GHS Up to ₹78,000 for common facilities (up to 500 kWp)

Note:
✔ Subsidy is only for residential connections.
✔ System must be installed by an empanelled vendor & must pass inspection + net metering to receive subsidy.

Solar System Price in Tricity (Chandigarh–Mohali–Panchkula)

Actual pricing depends on:

  • Type of panels (Mono PERC / Half-cut / DCR)

  • Type of system (On-grid / Off-grid / Hybrid)

  • Mounting structure design (RCC, tin-shed, elevated, etc.)

  • Shadow analysis and rooftop size

Estimated Price Range (Before Subsidy)

System Size Approx. Price Range
1 kW ₹75,000 – ₹85,000
2 kW ₹1,50,000 – ₹1,70,000
3 kW ₹1,89,000 – ₹2,15,000
4 kW ₹2,52,000 – ₹2,85,600
5 kW ₹3,15,000 – ₹3,57,000
6 kW ₹3,72,000 – ₹4,26,000
8 kW ₹4,64,000 – ₹5,28,000
10 kW ₹5,30,000 – ₹6,10,000

Solar Prices in Tricity After Subsidy

(For North India Residents under MNRE Scheme)

System Size Price Before Subsidy Subsidy Final Cost (Approx.)
1 kW ₹75k–₹85k ₹30k ₹45k–₹55k
2 kW ₹1.5L–₹1.7L ₹60k ₹90k–₹1.1L
3 kW ₹1.89L–₹2.15L ₹78k ₹1.11L–₹1.37L
4 kW ₹2.52L–₹2.85L ₹78k ₹1.74L–₹2.07L
5 kW ₹3.15L–₹3.57L ₹78k ₹2.37L–₹2.79L
10 kW ₹5.31L–₹6.07L ₹78k ₹4.53L–₹5.29L

How to Apply for Solar Subsidy in Tricity

(The process is identical for Chandigarh, Mohali & Panchkula)

Step 1 — Register Online

Visit the National Portal for Rooftop Solar and create an account.

Step 2 — Submit Documents

Upload details of your rooftop, sanctioned load, bank details, and KYC.

Step 3 — DISCOM Feasibility Approval

Your application goes to your local DISCOM:

  • Chandigarh Electricity Dept.

  • PSPCL (Mohali/Kharar)

  • UHBVN (Panchkula)

Approval typically takes 15 working days.

Step 4 — Choose an Empanelled Vendor

Only empanelled installers can complete subsidized installations.
Ensure:

  • Panels are ALMM-listed

Inverters are BIS-certified

Step 5 — Net Meter Application

After installation, apply for net metering through the same portal.

Step 6 — Inspection & Commissioning

DISCOM officer visits the site, checks the system, and approves commissioning.

Amount is directly transferred to your bank within 30 days.

What Is Net Metering?

Net metering allows your meter to run backwards when your solar system generates more than your home consumes.

Excess energy is exported to the grid → converted into solar credits → reduces your monthly bill.

In Tricity, most homes export 20–40% of solar generation.

This is why on-grid systems give the fastest payback.

How to Apply for Net Metering in Tricity?

Chandigarh

Apply via Chandigarh Electricity Dept. portal.

Mohali / Kharar / Zirakpur

Apply through PSPCL Net Metering Portal.

Panchkula

Apply via UHBVN Net Metering portal.

Submit documents → system verification → net meter installation → approval.

Why Solar Makes the Most Sense in Tricity

Tricity receives 5.2–5.6 kWh/m² of sunlight — almost ideal conditions for solar production.

Benefits:

You save lakhs over two decades.

FAQs for Tricity Homeowners

Register on the National Rooftop Solar Portal, get feasibility approval, install through an empanelled vendor, complete net metering, and receive subsidy directly in your bank.

Between ₹75,000 to ₹6,00,000 depending on system size (1kW to 10kW), panel quality, and type of inverter.

Typically 30 days after commissioning approval.

Approx. ₹2.37L to ₹2.79L in Chandigarh, Mohali & Panchkula.

Yes. A properly sized on-grid or hybrid system can easily support ACs, geysers, refrigerators, computers, fans, etc.

Only empanelled vendors can:

  • Install under subsidy

  • Manage approvals

  • Handle net metering

  • Ensure compliance with MNRE guidelines

One Simple Step to Get Started

Just fill the form. We’ll analyse your energy needs and share:

Everything is customized to your home and your budget.